Do you know the operation method of high temperature high pressure dyeing machine?
1. Before starting the machine, clean and clean the working area, machinery, equipment and tools, and get ready for work.
2. Check the equipment, instruments and meters to see if they are in good condition. In addition, replace the filter screen to avoid blockage. Only after everything is checked and there is no problem can the machine be started.
3, compressed air valve open, close the drainage valve, open the inlet switch, and then water.
4. Wait until the nozzle spurts out water, then lead the grey cloth into the dye VAT.
5. The door should be closed strictly, and there should be no leakage of air or liquid.
6. The operation speed of the dyeing machine and the pressure of the nozzle should be adjusted to ensure that the grey fabric can operate normally.
7. The dye solution should be added in a specified order, and it should be added slowly and evenly, so as not to affect the dyeing effect.
8. The dyeing procedure shall be automatically controlled by computer to ensure the accurate dyeing curve.
9, after the end of dyeing, until the temperature falls below 80℃ and the pressure drops to zero, you can open the boot cover, or you can't open it to avoid problems.
10. The dye cylinder is strictly prohibited to run without water, and the main pump is strictly prohibited to run without water.
11. When the temperature is above 80℃, do not open the backflow valve.
12. The filter should be cleaned every shift to avoid blockage or deposition.
If you are interested in our high temperature high pressure dyeing machine,you can contact me.
Email:huaxia@jjhuatai.com
Whatsapp / Wechat:86-13739109330
Contact:Xia Shaigen
Phone:86-13801428918
Tel:0086-523-84691028
Fax:0086-523-84691638
Add:No.88, Gongnong East Road, Jingjiang City, Jiangsu Province, China